Sunday, August 12, 2012

 started framing the bathroom for molding. Also notice the beginning of the 1x1 hex tiles.
 shot of our rare 5 1/2 foot wood rim clawfoot
 more shots of the panels
 opening of the 2 and 3rd bedroom to create the master bedroom
 removed the original closet in the 2nd bedroom to create more space. There are 2 closets behind me in the picture.
 And the tub is set in place. Still working on paint detail
 replaced some of the crown moldings.

 walls painted, getting ready for stencils.
 2nd bedroom is painted for our son.


No comments:

Post a Comment